Newel Post Installation

Below is a guide of how to fit a timber newel post to your new Express Stairs Yorkshire staircase.

Please note all our newel posts are dry fitted in our workshop as we build every staircase and all risers have been pre-fitted and labelled.

Newel Post Joint

First

Any newel posts that run to the floor that the staircase bottom tread sits on, you will find we have marked a floor line cut all around the newel post. Prior to cutting, you must check that your floor is level or site allowances will have to be made accordingly.

Newel Post Joint

Second

All our posts have been dry fitted. If you follow our cad drawing which is supplied with our delivery note paperwork, you will see that all newel posts and Tenon’s on strings are numbered. Once you are happy everything is in the correct place, then move onto the next stage. Using plenty of glue, slide the newel post into place and either using screws or dowels fix the newel post tight to the Tenon shoulder, (please note we Tenon our strings in the center to create a double shoulder which enables this process to be a little easier), then make sure your newel post is square to the tread.

Third

Before you begin to fix any of the staircase risers, all additional winder treads and bottom shaped treads, if ordered, i.e. bullnose tread or curtail treads must be fitted. Once these are fitted then proceed to fit all the risers. As before you will find these are numbered as they have been dry fitted. Use copious amounts of glue and fit all wedges and glue blocks supplied. Please wait until all glue is dry before walking on the staircase, this will stop any squeaks in the future as the glue will need time to go off.